Skip to main content Skip to search Skip to main navigation

Description

supports the entire load of the facade cladding (horizontal and vertical design of the substructure possible)
takes over the entire load of the facade cladding

fixed to wood or concrete, masonry and KS-stone with BeziFix® SR II dowel
Can be mounted on almost any surface, the BeziFix® SR II dowels always come with the appropriate drill for precise drilling through all materials

general building approval/ general type approval
Safety tested by the DIBt (German Institute for Building Technology)

high-quality and durable materials, very low thermal conductivity (λ of austenitic steel ~15 W/m*K)
Screw in stainless steel A4 and adjusting sleeve in aluminum protect against corrosion and thermal bridges

adjusts the facade
saves underlay work for leveling and also a multi-layered construction of the substructure

for full-surface thermal insulation
avoids thermal bridges

easy installation for soft, hard, blown-in, even full-surface insulation materials from 60 to 300 mm; can be used horizontally and vertically
fast, thus saving time and labor costs

including Systemstift® and assembly instructions
Included accessories - practical and time-saving

Technical data

Adjustment range (mm)
DS max. 6cm, DS max. 8cm, DS max. 10cm, DS max. 12cm, DS max. 14cm, DS max. 16cm, DS max. 18cm, DS max. 20cm, …
Length (mm)
198 to 438 mm
Material
stainless steel (A4)
Packing unit
Mehrwertpack, Montagepack
Stückzahl
1

Installation in four steps

  1. Set up the substructure

    Install Distancer®, maximum joist spacing 50 cm.

  2. Fix the first board

    Fasten the edge board visibly or with a start clip.

  3. Screw in DielenFix®

    From the side at a 45-degree angle through the groove into the substructure.

  4. Slide in the next board

    The spacer ensures an even joint.

Installation images

Assembly Step by step

Installing DielenFix® DF correctly Concealed fastening at a 45-degree angle through the groove
Preparing the substructure Fit Distancer®, maximum joist spacing 50 cm

Downloads

Data for planning and installation

Assembly guide, data sheet, approval, CAD data and specification text for this product.

  • 38905 5 24 Montageanleitung BeziFix Therm-H DE WEB PDF, 1,4 MB Download
  • TDB BeziFix Therm H EN PDF, 929 KB Download

FAQ

Frequently asked questions about terrace construction

Larch and Douglas fir are affordable and durable, thermally modified wood is particularly dimensionally stable, and hardwoods such as Ipe or Cumaru last the longest but require pre-drilling and A4 stainless steel.

For boards 21 to 28 mm thick, we recommend a maximum of 50 cm, for WPC 40 cm. Distancer® ensures ventilation between the board and the substructure.

As a rule of thumb, with a board width of 145 mm and a joist spacing of 50 cm, you need around 14 fasteners per m². The demand calculator on the product page calculates the exact quantity.

The webshop is reserved for trade businesses. As a homeowner, you can obtain SIHGA systems through our system partners, including advice and installation on request. Find a dealer

Service & contact

We are there when you need us

In person on the phone, on site via dealers and field service – or around the clock in our help centre.

Contact & team

Advice & dealer search

Enter your postcode – find field service and dealers in your region.

Find an advisor

Contact support

+43 7612 74370 0, Mon–Thu 7am–5pm, Fri 7am–12pm – or by email.

Call

FAQ & help

Answers to the most common questions about installation, ordering and products.

To help

Delivery & tracking

Track deliveries, retrieve invoices, register returns.

To account